Description
Gain the essential resources needed to prepare for and successfully manage progressive designbuild projects.DesignBuild is now utilized for greater than 50 of all executed projects within the United States according to a recent ENR study. The fastest growing delivery method option within designbuild is Progressive DesignBuild. However, many owners and practitioners struggle to understand the differentiating details of this collaborative delivery method. This topic will provide targeted content to educate participants on Progressive DesignBuild, how to implement it’s use and the nuances of the delivery method. Items to be addressed include delivery methods overview, procurement processes, implementation and execution. This information will ensure that individuals within all professional capacities obtain the essential resources needed to prepare for and successfully manage progressive designbuild projects.
Date: 2019-10-23 Start Time: End Time:
Learning Objectives
Delivery Methods Overview
• Design-Bid-Build
• Construction Management At-Risk
• Design-Build
• Progressive Design-Build
Procurement Process: Progressive Design-Build
• Single Step vs. Two Step Selection Process
• Contract
• Shortlisting
• Evaluation Factors
• Evaluation of Pricing
• Evaluation of Interviews
Risk Management and Contracts
Preconstruction Services
• Design Development Milestones
• Deliverables
• Transparency
Establishment of the Guaranteed Maximum Price (GMP)
• Role of Self-Performance
• Achievement of Secondary Goals (MBE, WBE, DBE)
Construction Phase Services
Progressive Design-Build Case Studies
• Lower Poplar and Rocky Creek WRFs
• Bush Beans WRF
Bryan R. Bedell, DBIA-The Haskell Company, Leofwin Clark – Brown and Caldwell